Set Workload Capacity Limits in ClickUp
Managing team workload in ClickUp becomes easier when you set clear capacity limits. This guide explains how to configure Workload view so you can plan work realistically, prevent burnout, and track availability for every person, team, or resource.
All instructions in this article are based on the official Help Center documentation for Workload capacity settings in ClickUp.
What capacity limits do in ClickUp Workload
Workload capacity limits define how much work a user, team, or resource can handle in a given time period. In ClickUp, these limits power the Workload view so you can see:
- Who is over capacity and may be overloaded
- Who has available time for new work
- How tasks are distributed across your team
- Whether your schedule is realistic based on estimated effort
Capacity is calculated using task attributes, such as time estimates, story points, or other effort values you track in ClickUp.
Requirements and access in ClickUp Workload
Before you start, make sure the following requirements are met in your ClickUp Workspace:
- You have access to the Workload view on the Space, Folder, or List where you want to track capacity.
- You have permission to edit the view settings for that location.
- The fields needed for capacity (for example, time estimates or a selected number field) are enabled and available on your tasks.
Capacity limits are configured per Workload view and can be customized differently in each part of your ClickUp hierarchy.
Open or create a Workload view in ClickUp
To start working with capacity, you need a Workload view at the Space, Folder, or List level in ClickUp.
- Open the Space, Folder, or List where you plan to schedule tasks.
- Select the existing Workload view from your view bar.
If you do not see one, click + View, choose Workload, and create it. - Once the Workload view opens, confirm the time scale (Days, Weeks, or Months) matches how you want to track capacity in ClickUp.
Open capacity settings in ClickUp Workload
Capacity limits are controlled from the settings panel inside each Workload view in ClickUp.
- In your Workload view, click the View settings or gear icon.
- Locate the section for Capacity or Workload settings.
- Open the capacity configuration panel to start defining how limits should be calculated and displayed.
Choose capacity unit types in ClickUp
You can configure capacity by different unit types so Workload reflects how your team measures effort inside ClickUp.
Use time estimates for ClickUp capacity
If you already estimate tasks in minutes or hours, you can use time estimates as your Workload capacity unit in ClickUp.
- In the capacity settings, select Time or Time Estimates as the unit.
- Choose the base unit (minutes or hours) according to how your team records estimates.
- Click Save or apply the change.
When this option is selected, each person’s capacity is measured in total estimated time across the selected date range in ClickUp.
Use numeric fields for ClickUp capacity
If you track effort with a custom numeric field such as story points, you can use that value as your capacity driver in ClickUp.
- Ensure your numeric field (for example, Points or Effort) is enabled on tasks.
- In capacity settings, choose the relevant number field as the unit for capacity.
- Apply your changes so the Workload view updates.
This option lets you plan capacity in ClickUp based on abstract effort rather than time, which is useful for agile or points-based estimation.
Set default capacity limits per user in ClickUp
You can define default capacity limits for each person so ClickUp knows how much work they can take on during each period.
- In the capacity panel, view the list of assignees or users.
- For each person, enter their capacity value (for example, 6 hours per day or 20 points per week).
- Repeat this for all team members that appear in the Workload view.
- Save or apply your changes.
These per-user defaults control how Workload colors and flags overcapacity in ClickUp. When the sum of assigned tasks exceeds the user’s limit, the bar typically appears in a warning or overloaded state.
Configure team and resource capacity in ClickUp
ClickUp Workload can show not only individuals but also teams or generic resources, such as machines or shared tools.
Set capacity for teams in ClickUp
- In the capacity list, locate your team rows if they are visible in Workload.
- Enter a capacity limit for each team row that reflects total combined effort the team can handle.
- Click Save to confirm.
Team-level capacity in ClickUp helps you understand if an entire group is overbooked, even when individuals appear balanced.
Set capacity for other resources in ClickUp
If your Workload view includes custom resources, configure a capacity limit for each one.
- Scroll through the capacity settings until you find your resource (for example, a shared device).
- Enter how much usage that resource can handle per time period.
- Apply your updates.
This allows ClickUp to show when a shared resource is fully booked and cannot support additional tasks in the same timeframe.
Adjust capacity for specific days in ClickUp
Sometimes a person has a different capacity on certain days, such as half-days, time off, or special events. You can adjust this directly in the Workload grid inside ClickUp.
- In the Workload view, locate the user row and the date you want to modify.
- Click on the capacity cell or bar for that day.
- Enter an adjusted capacity value, such as a reduced number of hours or points.
- Confirm the change.
This override affects only that specific day, while the default capacity in ClickUp remains unchanged for all other dates.
Understand overcapacity warnings in ClickUp
Once limits are set, ClickUp automatically compares assigned work against capacity in your Workload view.
- If total effort is below the limit, the user or resource appears within capacity.
- If total effort matches or slightly exceeds the limit, you may see a warning color.
- If total effort is significantly above the limit, the Workload bar shows an overloaded state.
Hovering over the bar in ClickUp usually reveals the total assigned effort versus capacity, helping you understand how far over or under limit the schedule is.
Rebalance work in ClickUp Workload view
When you see someone over capacity, you can rebalance tasks directly from Workload in ClickUp.
- Drag a task from an overloaded user to a different user with available capacity.
- Reschedule tasks by dragging them to different dates where more capacity is available.
- Adjust task estimates so they better reflect real effort.
These actions update capacity calculations in real time, giving you an up-to-date picture of workload in ClickUp.
Tips for accurate capacity planning in ClickUp
- Keep estimates updated so capacity reflects real effort.
- Review Workload at least weekly to catch overloads early.
- Use custom fields only if your team consistently maintains them in ClickUp.
- Align the view time scale (daily, weekly, monthly) with how your team actually plans work.
More ClickUp resources and help
To see the original instructions for setting capacity limits in Workload view, review the official Help Center article on the ClickUp website: Set capacity limits in Workload view.
If you need expert implementation help, training, or process optimization for your Workspace, consider working with a dedicated ClickUp consultant. You can learn more at Consultevo.
By configuring capacity limits correctly, you can use ClickUp Workload view to plan projects with confidence, keep teams balanced, and deliver work without overloading your people or resources.