×

ClickUp Guide to Functional Testing

How to Manage Functional and Non-Functional Testing in ClickUp

ClickUp can help you organize, track, and document both functional and non-functional testing so your software meets user expectations and quality standards.

This how-to guide translates the concepts from the functional and non-functional testing article into a practical workflow you can set up and use every day.

Step 1: Set Up a ClickUp Space for QA

Start by creating a dedicated Space in ClickUp for your quality assurance and testing activities. Keeping everything in one place makes it easier to manage requirements, test cases, and results.

  1. Create a new Space and name it something like QA & Testing.

  2. Add a testing-themed icon and color so the ClickUp Space stands out in your sidebar.

  3. Set permissions so only relevant QA engineers, developers, and product owners can edit tasks while other stakeholders can comment or view.

Within this Space, you can host Lists for different test types, such as functional tests, non-functional tests, regression, and user acceptance.

Step 2: Build a ClickUp Folder for Test Planning

Next, create a Folder in ClickUp to keep all planning assets for both functional and non-functional testing.

  1. In your QA Space, click New Folder and name it Test Planning.

  2. Add Lists for key planning artifacts, such as:

    • Requirements & User Stories

    • Test Strategy & Scope

    • Test Environment Setup

  3. Use ClickUp Docs inside this Folder to capture your testing strategy, including which functional and non-functional attributes you will verify.

Clearly documenting what you will test, and what you will not test, aligns your QA process with the principles described in the source article.

Step 3: Create a ClickUp List for Functional Testing

Functional testing checks whether specific features behave as expected according to requirements. You can represent each functional test case as a task in ClickUp.

  1. Inside your QA Space, create a Folder called Functional Testing.

  2. Add a List for each product area or sprint, for example:

    • Login & Authentication Tests

    • Shopping Cart Tests

    • API Endpoint Tests

  3. For each test case, add a task with a clear, action-based name like Verify user can reset password via email.

Recommended ClickUp Custom Fields for Functional Tests

Use custom fields in ClickUp so every functional test task includes consistent information.

  • Test Type (Dropdown: Functional, Smoke, Regression)

  • Priority (Low, Medium, High, Critical)

  • Requirement ID (text or relationship to a requirements List)

  • Preconditions (short text description)

  • Expected Result (text area)

  • Actual Result (text area, filled after execution)

  • Execution Status (Dropdown: Not Run, Pass, Fail, Blocked)

This structure mirrors the core ideas of functional testing from the article while turning them into a repeatable workflow in ClickUp.

Step 4: Create a ClickUp List for Non-Functional Testing

Non-functional testing evaluates qualities like performance, usability, security, reliability, and scalability. You can manage these tests as their own tasks within a dedicated ClickUp Folder.

  1. Create a Folder named Non-Functional Testing in your QA Space.

  2. Add Lists for key test categories, for example:

    • Performance & Load Tests

    • Security & Compliance Tests

    • Usability & Accessibility Tests

    • Reliability & Recovery Tests

  3. Create a ClickUp task for each non-functional test scenario, such as Measure homepage response time under 1,000 concurrent users.

Useful ClickUp Fields for Non-Functional Testing

Non-functional tests often include metrics and thresholds. Capture them using structured fields in ClickUp.

  • Attribute (Dropdown: Performance, Security, Usability, Reliability, Portability, etc.)

  • Metric (text, e.g., Response Time, Throughput, Error Rate)

  • Target Value (number + unit, e.g., < 2 seconds)

  • Observed Value (number + unit after test run)

  • Result (Dropdown: Meets Criteria, Needs Improvement, Fails)

These fields make it easy to compare actual performance with the criteria you derived from the concepts in the original testing article.

Step 5: Map Requirements to ClickUp Test Cases

A strong QA process links requirements directly to test coverage. ClickUp relationships and dependencies help you tie everything together.

  1. Create a Requirements List in your Test Planning Folder.

  2. Each requirement or user story becomes one task in ClickUp with its own ID.

  3. Open a functional or non-functional test task and add a Relationship to the corresponding requirement task.

  4. Use Dependencies if a test cannot run until certain features are developed or other tests are completed.

This mapping ensures every requirement has at least one functional and, where appropriate, one non-functional test case associated with it.

Step 6: Run Test Cycles in ClickUp Views

ClickUp offers multiple views that help you execute and monitor test cycles based on the functional and non-functional testing concepts from the source article.

Board View for Daily Test Execution

Use Board view to drag and drop test tasks through your workflow.

  • Create columns for Not Run, In Progress, Blocked, Pass, and Fail.

  • Filter the view by Release or Iteration using custom fields or tags.

  • Assign ClickUp tasks to testers and set due dates for each test cycle.

List and Table Views for Reporting

To review progress and coverage, List or Table views in ClickUp work well.

  • Group by Execution Status to see how many tests passed or failed.

  • Group by Attribute to analyze non-functional quality areas such as performance and security.

  • Use Filters to show only high-priority functional tests or only failed non-functional tests.

Step 7: Track Defects and Retesting in ClickUp

When tests fail, you can log and track defects without leaving ClickUp.

  1. Create a separate Bug Tracking Folder or List within your QA Space.

  2. When a test task fails, use a ClickUp automation to create a linked bug task, or manually add a related task.

  3. Include details such as steps to reproduce, screenshots, environment, severity, and affected version.

  4. Once developers resolve the defect, move the related test task back to Not Run or Ready for Retest and execute it again.

This mirrors the test and defect lifecycle described in functional and non-functional testing theory while remaining practical in a ClickUp workflow.

Step 8: Document Test Evidence in ClickUp

Evidence is crucial for audits, compliance, and future analysis.

  • Attach screenshots, logs, and performance reports directly to ClickUp test tasks.

  • Use Comments to capture observations during test runs.

  • Create a summary ClickUp Doc per release with high-level results, pass rates, and key issues discovered in functional and non-functional testing.

Keeping evidence close to each task makes it easy to understand how results were obtained and which tools or environments were used.

Step 9: Improve Your Testing Process with ClickUp Dashboards

Dashboards in ClickUp give you a quick overview of testing health across releases and attributes.

  1. Create a new Dashboard and connect it to your QA Space.

  2. Add widgets such as:

    • Task List filtered to failed tests

    • Pie Chart showing pass vs. fail vs. blocked tests

    • Bar Chart breaking down non-functional tests by attribute

    • Time Tracking to analyze test execution effort

  3. Share the Dashboard with stakeholders so they can see functional and non-functional quality status without digging into individual tasks.

Additional Resources for Optimizing ClickUp Testing

To refine your QA workflows further, combine the testing theory from the original article with broader process guidance and tooling support.

By combining clear test design with a structured ClickUp workspace, you can manage functional and non-functional testing in a consistent, auditable, and scalable way across all your software projects.

Need Help With ClickUp?

If you want expert help building, automating, or scaling your ClickUp workspace, work with ConsultEvo — trusted ClickUp Solution Partners.

Get Help

“`

Verified by MonsterInsights